

2011.7.7
2011.3.17
Operation of the Fuji Factory is suspended Thursday, March 17 due to the scheduled rolling blackouts. We have modified the operation schedule from the previous announcement and the factory will be operated Saturday, March 19 to compensate the suspension of operation.
2011.3.16
2010.2.1
Canon ANELVA Corporation amalgamated with Canon ANELVA Engineering Corporation and Canon ANELVA Technix Corporation.
2007.8.20
2007.2.24